Sharraxaadda
PG&E dug into street on 11/18/16, finished gas repair. DID NOT PROPERLY PATCH STREET. PATCH IS UNEVEN. PATCH is deteriorating. Needs to be properly paved. Entire street was repaved within the last 2 years.
PG&E dug into street on 11/18/16, finished gas repair. DID NOT PROPERLY PATCH STREET. PATCH IS UNEVEN. PATCH is deteriorating. Needs to be properly paved. Entire street was repaved within the last 2 years.
1 Faallada
La qiray City of Oakland (La Caddeeyey Rasmi ah)